John Bell House

John Bell House

  • Design & build
  • Design & build, 414 accommodation units
  • Eight-stories

Fresh Student Living

Started

Completed

Project Value

December 2014

August 2016

£4.5 million

Design & build refurbishment of the Belfast Institute of Further and Higher Education Building at College Square East, in the heart of Belfast City Centre. The project involved the fit-out of 414 new student accommodation units. The works were carried out over the five existing floors with three new floors added. Harvey Group were responsible for the mechanical and electrical building services installation.

Mechanical services installation included sanitary ware within the ensuites, which were designed in a pod structure for easy installation and connection.

Heat interface units were supplied in each room for both heating and hot water.

A new access control system was also installed, including wireless operated doors for studios.

All students require access control cards to enter and exit the building, providing the students with safe and secure accommodation.

Our use of cookies

Some cookies are necessary for us to manage how our website behaves while other optional, or non-necessary, cookies help us to analyse website usage. You can Accept All or Reject All optional cookies or control individual cookie types below.

You can read more in our Cookie Notice

Functional

These cookies enable core functionality such as security, network management, and accessibility. You may disable these by changing your browser settings, but this may affect how the website functions.

Analytics cookies

Analytical cookies help us to improve our website by collecting and reporting information on its usage.

Third-Party Cookies

These cookies are set by a website other than the website you are visiting usually as a result of some embedded content such as a video, a social media share or a like button or a contact map