Goathill Care Home
Harvey Group are delighted to have been selected by McLaughlin and Harvey to carry out the installation of the M&E…
-
St Joseph’s Crossmaglen
Works are under way for the installation of the M&E services on the new St Joseph’s Crossmaglen school. Harvey Group…
-
Hendon Hall Care Home
Harvey Group were engaged to deliver the M&E services on this 102-unit luxury care facility for Signature Senior Lifestyle Limited.…
-
Royal College of Pathology – Londo
Works on this project are well underway, with 2nd fix of all floors currently being carried out. Testing and pre-commissioning…
-
Green Pastures Church – Phase 1
Harvey Group PLC worked alongside Martin & Hamilton and Delap & Waller to develop and install the M&E building services…
-
Stanmore Care Home
Works are well underway at the new Stanmore Care Home facility. This new development will include a 64-bedroom dementia care…
-
Camden Schools
Harvey Group have been awarded the design & build contract for 3nr. schools in Camden. La Swap, William Ellis &…
-
Terumo BCT (Redlands)
The expansion of Terumo BCT located at Larne Harbour saw the extension of existing facilities to provide new production spaces…
-
Royal Central School of Speech & Dr
Harvey Group PLC are to Develop and Install the Mechanical & Electrical Building services at the new Royal Central School…
-
Sevenoaks School
Works are well underway at the new Science/Technology/Sixth form Centre, which forms part of the existing Sevenoaks School Educational Campus.…
-
Luton Airport
Harvey Group are the appointed Contractors, responsible for the design, development, installation & commissioning of the Mechanical & Electrical Services. This…
-
Concentrix Offices Belfast
The project comprised the design, refurbishment and extension of the existing Maysfield Leisure Centre which now forms a state-of-the-art office…
-
University of Ulster New Teaching Block
This new £11-million-pound teaching block provides facilities for 4,300 students within University of Ulster’s Magee Campus located in Derry/Londonderry. This…
-
Marriott Hotel Belfast
The new hotel is Marriott International’s first in Northern Ireland, joining the company’s portfolio of nearly 4,500 hotels located in 87 countries and…
-
Parklands Community Primary School ̵
This new Modular building provides 8 new classrooms, small hall/studio, library/ITC, staff room and all other associated facilities in a…
-
Anfield Stadium Store
Work on Liverpool FC’s new flagship store at Anfield is complete in time for the start of the new season 2017/18. Harvey Group…
-
Dublin Road Student Accommodation Belfas
Harvey Group worked alongside O’Hare & McGovern in delivering this new build Student Accommodation in South Belfast. Works commenced on…
-
North Foreshore Studios Belfast
The North Foreshore of Belfast Lough is former landfill facility which has been transformed into the largest development site in…
-
B2 City Quays Belfast
City Quays 2 is the second phase of the 10-hectare City Quays development in Belfast Harbour and offers a Grade…
-
Cleaver House Belfast
Refurbishment & alteration works are completed on our Cleaver House Project. This existing 6 Storey Building, has been renewed into prime Category B office accommodation in…
-
Lynch Hill Academy, Slough
Lynch Hill Academy, which started on site in January 2016, is a modular build construction comprising works both in Northern…
-
Furness House London
The redevelopment of Furness House provides modern open plan office accommodation over 4 floors. The newly equipped CAT A offices…
-
Student Accommodation College Square Eas
This Design and Build project involved the refurbishment of the old BIFHE Building, at College Square East, in the heart…
-
Castlecourt Offices
The redevelopment of the Castlecourt Offices provides modern open plan office accommodation over the second, third and fifth floors. During…
-
Waterfront Hall
In partnership with McLaughlin & Harvey, this 68 week project was successfully completed in March 2016. We have a long…
-
Ballymena Health Care Centre
Ballymena Health Care Centre is Northern Ireland's First Combined Health & Social Care Centre and is now the largest facility…
-
Girdwood Community Hub
Girdwood Community Hub, located in the heart of Belfast, was successfully handed over in November 2015. The project culminated in…
-
SERC – Performing Arts & Tech
The new £12 million facility will boost education and training across three areas creative industries, computing and engineering. Mechanical services…
-
Windsor Walk London
This Institute is a 5,255m┬▓ centre of excellence and is occupied by King's College Hospital. This building rehouses the world…
-
PWC Belfast
We have been fortunate to contract the refurbishment of several PWC offices. In 2013, we undertook the installation of services…
-
Kingspan Stadium Belfast
The Home of Ulster rugby, underwent a transformation and we were fortunate to deliver the M&E services on this Design…
-
University of Ulster Belfast
The New Block BA & BB is a nine-storey building split into a six-storey base and an upper level studio…
-
Wellcome Wolfson Centre of Experimental
Wellcome Wolfson Centre is a state of the art, purpose-built healthcare related building, located on the Health Sciences Campus, Belfast…
-
Sheffield Hallam University Heart of the
The Heart of the Campus Building was a New 3 storey development which consisted of Spacious Classrooms, PC Labs, Lecture…
-
Deloitte Technologies Belfast
This interior refurbishment and high quality fit-out of 3 floors formed open plan and cellular offices, a technology showcase room…
-
Churchill School Suffolk
The new building is part single storey/part two storey block, that comprises hub-style learning clusters for each year group. These…
-
Foyle Arena
Foyle Arena is a new leisure and events arena located in St Columb's Park, Derry. The state of the art…
-
8 Lanyon Plaza Belfast
This central Belfast project was a fast pace fit out of an existing superstructure in Lanyon Place. The project was…
-
Grindon Hall School Sunderland
A new accommodation block was needed as part of the expansion to the existing facilities at Grindon Hall due to…
-
Terumo Production Cleanroom, Larne
The development of the Turemo Cleanroom alongside Lagan Construction, incorporated a new clean room for Autoclave facilities, environmental controlled storage…
-
University of Sheffield Engineering Grad
This project is the centre of the faculty's postgraduate research and postgraduate teaching activities. The Graduate School house's collaborative and…
-
Titanic Museum
Main Contractor: Harcourt Construction Site Management Office Sydenham Road Belfast BT3 9DJ 028 9040 9960
-
Belfast Metropolitan College
The new Belfast Metropolitan building combines classrooms and training facilities for 2,500 students with commercial suites, offices, a library, cafes,…
-
St Mary’s College
St Mary's College in Derry provides a hi-tech campus at the heart of the digital corridor on the Northland Road.…
-
St Cecilia’s College
This project consisted of the provision of the complete mechanical & electrical installation for the new build replacement schools for…
-
St Patrick’s Grammar School
St Patrick's Grammar School based in Downpatrick is approximately 9,900m┬▓ and has 700 pupils. Harvey Group formed part of the…
-
Grosvenor Grammar School
This project is a new 2 storey build which was integrated into existing Ken Reid science building. This was Procured…
-
Portadown CTCC
The Portadown Community Treatment and Care Centre is the first facility of its kind to open in Northern Ireland providing…
-
ARC Apartments
This new build project consisted of 500 apartments and commercial units within 6 multi- storey blocks. The ARC apartments are…
-
AFBI Hillsborough
Harvey Group and H&J Martin worked closely with AFBI staff on this flagship research facility in Hillsborough while installing experimental…
-
Orangefield PS & Nursery
Located in East Belfast, The new school contains a 14 classroom primary school and 2 class base nursery school at…
-
Valley Leisure Centre
Installations on this leisure centre included Plant room installation of air handling units, Duct work installation, removal of storage tanks,…
-
Ivex Pharmaceuticals
This project was an extension to the IVR Production cleanroom. It was a challenging programme carried out safely in a…
-
Ritek Omagh Cleanroom
This project provided a new cleanroom area for the manufacture of electronics. Electrical services included HV Transformers, Main LV Panel,…
-
Phoenix Natural Gas
This office project was part of a major redevelopment scheme in Belfast which had a very challenging co-ordination exercise due…
-
Seagate Springtown
High level of co-ordination required, especially during the design development period to working drawing status. 26 fan tower units, each…
-
Original Waterfront Hall
Harvey Group used the original project to develop our specialist skills in pipe prefabrication, we called it the “Toast Rack”…