enquiries@harveygroup.co.uk 028 9034 2444 015 8260 0067

Original Waterfront Hall

Harvey Group used the original project to develop our specialist skills in pipe prefabrication, we called it the “Toast Rack” pipe system. This innovation was used to overcome the challenge of making best use of the space available within the unique circular plant room. We have since gone on to use this system and similar systems to coordinate and prefabricate services in many projects since.

The Belfast Waterfront Hall is an iconic project which is instantly recognisable as a landmark of our city and we are proud to have worked on this beautiful building.

Features Include:

 

  • Services installation within studio's, concert hall and auditorium.
  • Specialist pipework and ventilation installation due to the challenging architectural design.
  • Multiple boiler plant installation.
  • Intensive customer interface required.
  • Fast Track Programme

Main Contractor

Gilbert Ash
47 Boucher Road
Belfast
BT12 6HR

M&E Consultant

Mott Macdonald
40 Linenhall Street
Belfast
BT2 8BG

Architects

Robinson & McIlwaine
Ist Floor
7 James Street South
Belfast
BT2 8DN