High level of co-ordination required, especially during the design development period to working drawing status. 26 fan tower units, each capable of 132,000 CFM were used to achieve the environmental conditions within the facility.

Features included:

  • Pipework services were prefabricated, preinsulated, identified and mounted on steelwork racks off site to tie into the structural steel work frame thus minimising on site welding and to achieve the stringent programme conditions.
  • HVAC / Process Pipework / Vent Services to 50,000sq feet to 'Ballroom' cleanroom.