Terumo Production Cleanroom, Larne

  • Turemo1
  • Turemo3
  • Turemo2
  • Turemo4

The development of the Turemo Cleanroom alongside Lagan Construction, incorporated a new clean room for Autoclave facilities, environmental controlled storage area, boiler house, switch room and compressor room. This involved reconfiguring the existing unit to form a new processing and storage facility. The clean room facility is 800m2 and was completed in January 2014 after a rigorous IQ/OQ process.

Features Include:

  • Refurbishment of existing warehouse facility to provide new 800m2 production clean-room and 650m2 warehouse
  • Services included upgrade of existing NIE transformer, LV distribution, General and emergency lighting, modification and extension of existing fire alarm, intruder alarm, access control and CCTV system
  • LED lighting utilized for throughout clean-room and changing facilities and emergency lighting throughout
  • Two stage Installation Qualification / Operational Qualification validation process
  • Complex BMS controls installation to monitor and adjust the positive/negitive pressure regime within the cleanrooms
  • Existing offices modified to be fed from new plantroom