The redevelopment of the Castlecourt Offices provides modern open plan office accommodation over the second, third and fifth floors. During the initial 12 week design development phase prior to construction, we worked closely with main contractors, O'Hare McGovern and M&E Consultants, Beattie Flanigan, developing the Mechanical and Electrical design to installation stage.
The works were carried out over 4 phases:
- Phase 1 - 5th Floor
- Phase 2 - 3rd Floor
- Phase 3 - 2nd Floor
- Phase 3A - 2nd Floor
Demolitions of Mechanical and Electrical installations included circuits, data cabling, cover plates, spine trunking, ventilation ducting, radiators and associated pipe-work. Some of our works included removal of oil fired boilers which were replaced with new gas fired boilers and associated flues.
A new Gas Fired VRF and fresh air system was installed with complete new BEMS system with integration to existing. A new Public Address system, Information Technology facilities, Small Power installation, Lighting and Fire Alarm systems all formed part of our works.
Key Features are: