enquiries@harveygroup.co.uk 028 9034 2444

Green Pastures Church – Phase 1

Harvey Group PLC worked alongside Martin & Hamilton and Delap & Waller to develop and install the M&E building services for the new Green Pastures development.  The new Church complex includes a main auditorium, classrooms, meeting spaces, a studio, cafe, crèche, offices, gym & fitness studio as well as alterations to the car parking and additional development work.

Phase 1 MEP services included:

  • Ventilation via air handling units with heat recovery function
  • Energy efficient LED Lighting
  • Fire alarm & security systems
  • Domestic hot & cold-water services
  • Sanitary ware installation
  • LTHW heating system via underfloor
  • Lightning protection
  • Small power & data
  • LV distribution
  • Above ground drainage
  • Stage lighting & sound systems

Harvey Group where able to significantly reduce lifecycle and running costs through innovative solutions, which we integrated into the project.

Image Credits: HPA Architecture 

Main Contractor

Martin & Hamilton
46 Doury Road,
Ballymena,
BT43 6JB

Architect

HPA Architecture
Unit 4 Seagoe Industrial Area,
Portadown,
Craigavon,
BT63 5QD

M&E Consultant

Delap & Waller
Unit 12
Antrim Technology Park
Antrim
BT41 1QS