B2 City Quays complete!

  • GQ6C1206
  • GQ6C1234
  • GQ6C1260
  • GQ6C1274
  • GQ6C1286
  • GQ6C1348
  • GQ6C1395

Harvey Group have successfully completed the Development, Installation and Commissioning of the Mechanical and Electrical Services.

City Quays 2 is the second phase of the 10-hectare City Quays development in Belfast Harbour and offers a Grade A managed office block with coffee shop at ground floor and car parking.

At 9 stories high and almost 9,000m2 floor area, the development offers a flexible working space augmented by a sustainable design and installation.

Mechanical Services installed include Air Conditioning, Chilled Water, LTHW Heating System, Gas installation, Domestic Services, Soils & Wastes, Sanitary Ware, Ventilation & associated ductwork and a packaged plantroom installed on the roof.

(Read more on the packaged plantroom “here” ).

Electrical Services involved installation of Data / Structured Cabling system, Fire Alarm, Access Control & Intercom, Intruder Alarm, CCTV, Facilities for the disabled, Small power & Low Voltage Switchgear & distribution throughout.

Rainwater Harvesting & Energy Efficient LED lighting was installed under the M&E contract and significantly contributed towards the building achieving a BREEAM rating of “Excellent”.

Well done to all the team involved in making this project a success!