enquiries@harveygroup.co.uk 028 9034 2444

Recent Posts by Nicole Wharry

Goathill Care Home Development Project

Harvey Group are delighted to have been selected by McLaughlin and Harvey to carry out the installation of the M&E services on the Goathill Care Home Development, Stornoway. The development consists of a 52-bed Care Home and 50-bed Housing with Extra Care facility and is scheduled to be completed in December 2021. The M&E installation…
Read more

St Joseph’s Crossmaglen

Harvey Group are delighted to have been selected by O'Hare & McGovern to carry out the installation of the M&E services on the new St Joseph’s Crossmaglen school. The new £19.6M construction project will see the completion of a new school building, sports facilities, car parking, and bus set down areas on the existing school…
Read more

Hendon Hall, London

Harvey Group were delighted to be engaged by Farrans Construction to deliver the M&E services on the 102-unit luxury care facility for Signature Senior Lifestyle Limited at Hendon Hall in London. The project is a £21M construction project comprising the retention and refurbishment of the Grade II listed original Hendon Hall built in 1755, together with…
Read more

Belfast City Quays 3

Following prefabrication at our workshop in Newtownabbey, our Operations Team have successfully installed the Chilled Water pipe frames into risers at Belfast City Quays 3. Thank you to the Farrans site team for their professional assistance on this install. Check out these images from this project.
Read more

Jewish Care Sandringham Development, Stanmore

Harvey Group were delighted to be engaged by McLaughlin & Harvey to deliver the M&E Services on the Jewish Care Sandringham Development, Stanmore. This project undertook transforming the existing care home into a new care community which includes 48 independent living apartments, 16 assisted living one room flats, 64-bed EMI care, communal areas, a central…
Read more

Take 5 for January

Back to work after our Christmas break and as a key part of Harvey Group’s ongoing commitment to Health and Safety, we are delighted to launch our ‘Take 5 for January’ campaign.Watch this video below and let's all Take 5 and remain safe as we return to work!
Read more

Recent projects in our pre fabrication workshop

We are making great progress with numerous projects within our pre fabrication workshop. Some of which are;  -Our Chilled Water Plate Heat Exchanger frame -We have fitted out our welding bays with specialised ventilation equipment to remove the possible toxic fumes produced during the welding process Here you can see our Pipework being prepared for…
Read more

Henry Brothers Project

Another successful project in partnership with Henry Brothers recently completed. At Harvey Group we are proud to have provided all the mechanical and electrical services to this project, upgrading an existing building for a public sector client. This was an exciting project for Harvey Group and showcases the potential of an existing building brought into…
Read more

Recent Comments by Nicole Wharry

No comments by Nicole Wharry yet.